Exposé Apartments
A separate construction community in the legal form of a registered partnership (eGbR) is formed for each construction phase.
Site section 4
Baugemeinschaft Nestbau³ Süd eGbR
Start of construction of the house 1 Summer 2026
Occupancy as of Summer 2028
Start of construction of house 2 Summer 2026
Occupancy as of Summer 2028
Start of construction of house 3 Summer 2026
Occupancy as of Summer 2028
Building 01 Exposé pro.b (26-01-13) NEW
Building 02 Exposé pro.b (26-01-13) NEW
Building 03 Exposé pro.b (26-01-13) NEW
Site-Section Baugemeinschaft Nestbau3 Süd eGbR
Site section 3
Baugemeinschaft Nestbau³ Mitte eGbR
Start of construction of the house 4 Summer 2025
Occupancy as of summer 2027
Start of construction of house 9 summer/autumn 2025
Occupancy as of summer/autumn 2027
Start of construction of house 10 summer/autumn 2025
Occupancy as of summer/autumn 2027
Building 04 Exposé pro.b (26-01-28) NEW
Building 09 Exposé pro.b (25-11-24) NEW
Building 10 Exposé pro.b (26-02-02) NEW
Site-Section Baugemeinschaft Nestbau3 Mitte eGbR
Site section 2
Baugemeinschaft Nestbau³ Ost eGbR
Start of construction of the house 7 October 2024
Occupancy as of winter 2026
Start of construction of house 8 December 2024
Occupancy as of winter 2026/2027
Building 07 Exposé EMP occupied
Building 08 Exposé planbar3 occupied
Site-Section Baugemeinschaft Nestbau3 Ost eGbR
Site section 1
Baugemeinschaft Nestbau³ Nord eGbR
You can join the property development cooperative as of now
Start of construction of house 5 21.05.2024
Occupation as of spring 2026
Start of construction of house 6 September 2024
Occupation as of autumn 2026
Building 05 Exposé pro.b occupied
Building 06 Exposé K9 occupied
Plans
Site plan for buildings 1-10 (25-01-27)
Ground floor plan of the entire project, buildings 1-10 (25-01-21)
Standard floor plan, 2nd floor, overall project, buildings 1-10 (25-01-29)
Floor plan of underground car park lower ground floor level 1, overall project, buildings 1-10 (25-05-28)
Floor plan UG-2 buildings 1-10 (24-01-30)
Floor plan of underground car park lower ground floor level 1, buildings 5-8 (23-10-30)
Floor plan of lower ground floor level 2, building 5 (23-10-30)
Additional documents
Application for admission to the property developmet cooperative Baugemeinschaft Nestbau³ Nord eGbR – BA 1 (occupied)
Application for admission to the property development cooperative Baugemeinschaft Nestbau³ Ost eGbR – BA 2 (24-05-15)
Building specifications for Houses 5-6-7-8 PDF (24-04-23)