Documents
Exposés of the flats
An independent property development cooperative in the legal form of a GbR will be formed for each site section.
Site section 1
Baugemeinschaft Nestbau³ Nord GbR
You can join the property development cooperative as of now
Start of construction of house 5 21.05.2024
Occupation as of spring 2026
Start of construction of house 6 September 2024
Occupation as of autumn 2026
Building 05 Exposé pro.b occupied
Building 06 Exposé K9 (24-10-09) NEW
Site-Section Baugemeinschaft Nestbau3 Nord GbR
Site section 2
Baugemeinschaft Nestbau³ Ost GbR
Start of construction of the house 7 October 2024
Occupancy as of winter 2026
Start of construction of house 8 December 2024
Occupancy as of winter 2026/2027
Building 07 Exposé EMP (24-10-16) NEW
Building 08 Exposé planbar3 (24-10-30) NEW
Site-Section Baugemeinschaft Nestbau3 Ost GbR
Site section 3 and site section 4
We are currently preparing the building application for site section 3.
As soon as the approvability of the project is ensured, apartments can be occupied there.
For site section 4 we are working on the final implementation concept.
Plans
Site plan for buildings 1-10 (23-11-15) NEW
Ground floor plan of the entire project, buildings 1-10 (23-11-15) NEW
Standard floor plan, 2nd floor, overall project, buildings 1-10 (23-07-17)
Floor plan of underground car park lower ground floor level 1, overall project, buildings 1-10 (23-07-17)
Floor plan of underground car park lower ground floor level 1, buildings 5-8 (23-07-17)
Floor plan of lower ground floor level 2, building 5 (23-07-17)
Additional documents