Documents
Exposé Apartments
A separate construction community in the legal form of a registered partnership (eGbR) is formed for each construction phase.
Site section 3
Baugemeinschaft Nestbau³ Mitte eGbR
Start of construction 4 Summer 2025 – Occupancy as of summer/autumn 2027
Building 04 Exposé pro.b (26-04-20) NEW
Building 09 Exposé pro.b (26-04-21) NEW
Building 10 Exposé pro.b (26-04-21) NEW
Site section 4
Baugemeinschaft Nestbau³ Süd eGbR
Start of construction Summer 2026 – Occupancy as of Summer 2028
Building 01 Exposé pro.b (26-06-10) NEW
Building 02 Exposé pro.b (26-05-11) NEW
Building 03 Exposé pro.b (26-06-30) NEW
Site section 2 – OCCUPIED
Baugemeinschaft Nestbau³ Ost eGbR
Start of construction October 2024 – Occupancy as of winter 2026/2027
Building 07 Exposé EMP
Building 08 Exposé planbar3
Site section 1 – OCCUPIED
Baugemeinschaft Nestbau³ Nord eGbR
Start of construction 21.05.2024 – Occupation as of autumn 2026
Building 05 Exposé pro.b
Building 06 Exposé K9
Plans
Site plan for buildings 1-10 (25-01-27)
Site-Section 4 Baugemeinschaft Nestbau³ Süd eGbR
Site-Section 3 Baugemeinschaft Nestbau³ Mitte eGbR
Site-Section 2 Baugemeinschaft Nestbau³ Ost eGbR
Site-Section 1 Baugemeinschaft Nestbau³ Nord eGbR
Ground floor plan of the entire project, buildings 1-10 (25-01-21)
Standard floor plan, 2nd floor, overall project, buildings 1-10 (25-01-29)
Floor plan of underground car park lower ground floor level 1, overall project, buildings 1-10 (25-05-28)
Floor plan UG-2 buildings 1-10 (24-01-30)
Floor plan of underground car park lower ground floor level 1, buildings 5-8 (23-10-30)
Floor plan of lower ground floor level 2, building 5 (23-10-30)
Additional documents
Application for admission to the property developmet cooperative Baugemeinschaft Nestbau³ Nord eGbR – BA 1 (occupied)
Application for admission to the property development cooperative Baugemeinschaft Nestbau³ Ost eGbR – BA 2 (24-05-15)
Building specifications for Houses 5-6-7-8 PDF (24-04-23)